My roleI set the scope and pacing, coached the team, and made the UX and UI calls wherever options narrowed to one. Four interns ran the research and built the screens.
After a candidate accepted a contingent offer, their background check, tax-credit screening and onboarding progress lived in separate modules. No single view showed where anyone stood.
12 weeks, a four-person intern team, and a brief with no defined scope. In phase 1 the dashboard could read from the other modules but not act in them.
A dashboard design validated in 3 rounds of testing with 8 users, handed to product management with a product requirements document and specs. Product management took it to leadership and got the project prioritized.
Recruiters and background check staff kept personal spreadsheets to stitch the four answers together.
Mid-size and large clients felt the gap most, because several people touched each candidate and none of them could see what the others had done.
I led a four-person intern team on this project while running the company's design internship program, two teams of four that summer, alongside my design operations work. The program took on product work that neither product management nor design had the capacity to prioritize. I set the calendar and pacing for every team and reviewed every piece of work this team produced. Wherever the team had several options and settled on one, I guided or made that call.
Research ended with three rules the design had to follow, each one tracked to its source in the team's assumption log.
Feedback sorted into needs and pain points.
Every belief, who it came from, and whether it was confirmed, still open or abandoned.
In phase 1 it reads from the other modules and takes no actions in them.
Who on the client's team is responsible for each candidate's progress.
Applicant tracking, background checks, tax credits and onboarding.
10+ interviews validated all four.
“[I spend] at least an hour per candidate… 70% of my time in my ledger.”Talent acquisition operations specialist, interview
Split the useful actions across the team, in pairs or solo
Cut what isn't worth the time it costs
The team went wide before it narrowed, twice: sketches and a critique wall before the feature list, then mid-fidelity versions and testing before high fidelity. At each point where versions narrowed to one, I guided or made the call.
The candidate progress tracker shows how that narrowing worked. Try the early version, then the final one.
Nothing happens. In early usability testing, all 4 participants expected a count to open the candidates behind it.
The team tested at every fidelity with the people who would use the dashboard, and I took one of the mid-fidelity sessions myself, playing a hiring manager.
The final design opens on the progress tracker above one table of every candidate, built on the company's design system. Ownership and recent activity, two of the rules from research, show up in every row and every drawer.
In week 12 the team handed product management the documentation it would need to plan the build. The product manager said the findings and deliverables were what let them take the project to leadership and get it prioritized.
Development was never the goal of the program. The product manager planned to fold the dashboard into a larger onboarding initiative already on the roadmap, with its own build and release strategy.
The hand-off included a clickable prototype for each persona’s task. All three run here, in a full window with a guide along the top.